Integrated Issue 5

Published on Friday, December 28th, 2018


Please see link below to download Integrated Issue 5, which includes:

  • Team in the spotlight – Integra London
  • Product Liability and Recall – two sides of the same coin
  • Mining Insurance Review
  • Contingent Business Interruption
  • A consistent process – wide area damage
  • New normal or the calm before the storm – rig reactivation
  • Resolving claims for PV modules
  • Angles, velocity and movement – damage to berthing structures in ports and terminals

Download